Monsanto Agricultural Group coordinated 500 packaging items across 15 locations worldwide with a twelve-step approval process that took two or three months. Keene Systems’ PC-Specs software linked the offices and cut that to two or three days, a reduction of 97%.
This case study appeared in Package Engineering Magazine.
Monsanto Agricultural Group serves farmers, landscapers and homeowners from 15 locations around the world, and manages some 500 packaging SKUs across them.
Even with a company-built database and hard-copy backup, the group had its hands full. The approval process involved 12 sequential steps, said Mike Stoppleman, Monsanto’s purchasing manager. Documents were passed around headquarters and the plants, and could be delayed for days at any step. A package designer who wanted to check progress found it hard even to locate the documents.
The delay had real costs. Plant managers could order packaging components that were no longer used or were the wrong size. Worse, the introduction of a new package or product could be held up.
Stoppleman suggested packaging software that could be networked to connect all of the group’s locations in real time. Monsanto chose Keene Systems’ PC-Specs.
The need to keep track of a spec is gone. There will be a need for some follow-up using electronic mail, but with the return-and-reply capabilities, our turnaround time is no more than five days.
Mike Stoppleman, Purchasing Manager, Monsanto Agricultural Group
This project dates from the era of office networks and dial-up connections, and the technology has moved on. The problem has not. Approvals still move one desk at a time, and offices in different places still work from different copies. Today Keene Systems solves it with a web application that every department, plant and supplier reaches from a browser. See one system for every division and moving a paper process into software.